Clogged floor drain in Hayden

Called to Maverik in Hayden for a clogged floor sink and we quickly got there and cabled the line and did a chemical treatment to remove residual buildup and hair.

Commercial Clogged Sewer line repair in Coeur d’ Alene

Today we were called out at High Point Medical in Cd’a for a clogged sewer line on a commercial building that multiple plumbing companies tried to unclog but were not successful. Upon diagnosis, we found the main backwater valve was clogged with frozen toilet paper and the valve was frozen shut. We tried to remove the valve with standard tools and were not successful, so we brought out our special proprietary equipment to thaw out 5 feet down enabling us to easily unclog the drain line and remove the previously frozen in backwater valve for inspection. We also found the valve needed replacing. We quickly replaced the valve and their plumbing was back to normal.

Urinal installation

We installed two new urinals at the Post Office in Post Falls. Thanks to our hard working Federal Employees for their enduring service!

 

backflow valve

Backflow Valve Replacement

We replaced a backflow valve at Maverik Gas Station in Couer d’Alene, Idaho and we will have the valve certified and inspected today by a city of Coeur d’ Alene inspector.